Worry with time horizon in dynamic CGE (Simulation)

Hello GAMS users,

I need your support in my GAMS code attached below.

I have adapted my SAM to the dynamic CGE model of PEP network. It normally replicates the baseline. However, in simulations where I set the time horizon at 10, it doesn’t work properly. In very few cases, I obtain the results on 3 years only. Also, I would like to apply a 10 percentage change in exogenous variables but currently it does not exceed 2%.

How can I come over these issues?

I attached all the necessary files.

With regards,

Rodrigue
RESULTS PEP 1-t SIM1.GMS (24.5 KB)
RESULTS PEP 1-t BAU.GMS (17.3 KB)
para_agg.xlsx (22.7 KB)
Tabac_Agg.gms (65.6 KB)
MCS.xlsx (91.7 KB)