hi
please he me about coding of flexible job shop scheduling. My question is that how define sequence and assignment operations(withe different proceeding time).
for example: we are 1 job, with 5 operations and 4 machines and their sequence and assignment are respectively: O11->O22->O33->O42->O54.
O11, means that operation for Machine 1. notice that operation of 2 and 4 do by machine 2.
thanks a lot.