Hi all,
I am using MCP to solve a model. If I solve for t=5 (MCP5), it gives me a solution. If I solve for t=10 (MCP10), it gives me an error ‘infeasible’. Could someone help me solve the problem?
Hi all,
I am using MCP to solve a model. If I solve for t=5 (MCP5), it gives me a solution. If I solve for t=10 (MCP10), it gives me an error ‘infeasible’. Could someone help me solve the problem?
Hi Fabio
Your five-period model has some problems already. Take a look a the manual of Path and look up “redefined”. I think you should go back to the drawing board and derive your equations (probably from some kind of maximation problem).
Cheers
Renger