How to change the Set, because for me decision variable is also the Set

Hello Everybody,

Thanks for the replies for my previous queries.

Now, i am bit strucked with the decision variable (which is the set)
in my problem.

obj = sum((i,j,m), cost(i,j,m))

m is the decision variable/set with the bounds 1 to 10.

is there anyway fix this problem.

Thanks

Swin
–~–~---------~–~----~------------~-------~–~----~
To post to this group, send email to gamsworld@googlegroups.com
To unsubscribe from this group, send email to gamsworld+unsubscribe@googlegroups.com
For more options, visit this group at http://groups.google.com/group/gamsworld?hl=en
-~----------~----~----~----~------~----~------~–~—

\

Is there any way to change set size. Because the set size is the
decision variable to optimize.

Thanks

Swin


On Oct 8, 11:42 am, swin wrote:

Hello Everybody,

Thanks for the replies for my previous queries.

Now, i am bit strucked with the decision variable (which is the set)
in my problem.

obj = sum((i,j,m), cost(i,j,m))

m is the decision variable/set with the bounds 1 to 10.

is there anyway fix this problem.

Thanks

Swin
–~–~---------~–~----~------------~-------~–~----~
To post to this group, send email to gamsworld@googlegroups.com
To unsubscribe from this group, send email to gamsworld+unsubscribe@googlegroups.com
For more options, visit this group at http://groups.google.com/group/gamsworld?hl=en
-~----------~----~----~----~------~----~------~–~—

\